Presenting a Cost Management Model Based on the Project Management Body of Knowledge (PMBOK) Standard System in the Project-oriented Company Karan Polymerpart

Document Type : Research Paper

Authors
1 Corresponding author: Ph.D. Student, Department of Industrial Engineering, Faculty of Industrial Engineering, University of Eyvanekey, Eyvanekey, Iran
2 Assistant Professor, Department of Management, Faculty of Humanities, University of Eyvanekey, Eyvanekey, Iran
Abstract
Over the past few decades, businesses around the world have undergone many changes. Customers and consumers are not completely satisfied with the current state of products and services, both in terms of quality and quantity. They expect manufacturers to provide high-quality and inexpensive products that can quickly adapt to changes in the environment. Looking at this change, manufacturers and economic enterprises have moved their production processes to project-oriented initiatives. Therefore, a large number of projects fail to deliver on time, with the desired budget and the level of quality expected by the customer. One of the most important reasons for their failure is poor financial support for projects, which can be attributed to the lack of following a standard methodology for implementing the desired projects. One of these methodologies is the use of the PMBOK project management standard. One of the areas of project management knowledge in this standard is project cost management. Cost management includes processes related to cost management planning, cost estimation, budget determination, and cost control so that the project can be completed on time and with the approved budget. This research is conducted at Karan Polymer Part Company, which is one of the manufacturers of door handles for cars made in Iran. The research method is applied and in terms of cost control and the method of data collection is descriptive-survey type, which was designed and presented after studying the subject literature and field studies and utilizing existing documents and the PMBOK project management standard in the aforementioned company and within the framework of the company's cost management and control, while designing, distributing, and completing questionnaires, templates, and sub-templates of cost management. The statistical population of the research is experts (managers and experts of Karan Polymer Part Company) and elites (university professors) in the fields of cost management and project management. To measure the validity of the questionnaires, the carcass calculation formula (above 0.6) and its reliability were obtained with the help of SPSS software and Cronbach's alpha calculation (above 0.7), and as a result, the validity and reliability of the questionnaires were confirmed with a high percentage. After completing the questionnaires by company experts and academic elites, a template and three sub-templates were designed and presented, each of which provides company managers with various processes and tools for selecting and monitoring the implementation of projects. By implementing this template and sub-templates, production managers in the company will be able to manage the cost, time, and quality of manufacturing each product in an integrated manner.
Keywords

Copyright ©, Fatemeh Anghaie, Seyed Rasoul Hosseini Baharanchi

 

License

This article is released under the Creative Commons Attribution (CC BY 4.0) license. Anyone is free to copy, share, translate, and adapt this article for any purpose, whether commercial or non-commercial, as long as proper citation is given to the authors and original publication.


[1]پاک مرام عسگر، محمدی بیژن،بیکزادهجعفر،)پاییز(1389،"عوامل موثر برکاربرد سیستمهای مدیریت هزینه
در صنعت پتروشیمی"، مجله فراسوی مدیریت، سال چهارم، شماره14، صفحۀ131.
[2] خانجانزاده کورش،(1381،)"مدیریت هزینهدر پروژههای ساخت"، پایان نامه کارشناسی ارشد، دانشگاه تهران.
[3] دربانی، ابوالفضل.(1389،)"دالیل انحراف از هزینه پیشبینی شده و اجرا با استفاده از شاخص اهمیت نسبی
(مطالعه موردی: پروژههای مدرسه سازی(". ششمین کنفرانس بینالمللی مدیریت پروژه،تهران.
[4]دهقان محسن، نوری سیامک،ابنالرسول سیداصغر،(1381،)"طراحی الگوی مدیریت هزینه در پروژههای
عمرانی"، اولین کنفرانس مدیریت اجرایی، تهران.
[5] عظیمی رضا، شاکری اقبال، (1391،)"کاربرد روش هزینه یابی فعالیت محور جهت مدیریت هزینه در صنعت
ساخت و ساز"، دومین کنفرانس بین المللی مدیریت پروژه، تهران.
[6]فرجم شایی محمدرضا، بیاتی علی،ابراهیمی مهدی،(1391،)"استاندارد عملی مدیریت ارزش کسب شده"، موسسه
مدیریت پروژه(PMI)، ترجمه،ص256،تهران: آریانا قلم.
]7]مصدق خواه مسعود و یارمحمدی حسین مراد،(1392،)"ارایه الگوی مدیریت هزینه مبتنی برPMBOKدر
پروژه های ساخت گروه اجرایی سپاسد با تاکید بر کنترل هزینه"، پایان نامه کارشناسی ارشد، دانشگاه جامع امام
حسین (ع).
ارایه الگوی مدیریت هزینه مبتنی بر نظام استاندارد پیکره دانش مدیریت پروژه(PMBOK)درشرکت پروژه محور کران پلیمرپارت
112
[8] Arditi and Chotibhongs. (2009), "Detection and prevention of unbalanced bids", Construction Management and Economics, Volume 27, Issue 8, 2009.
[9] Diton, William, "Cost Management of Construction Project. ( 2012 ) "Available at: http://www.assignmentdesigner.com/article/detail/54html, Accessed Jan 06, 2003.
[10]Khalied Hesham Hyari, Khaled El Rayes, Mohammad El‐Mashaleh, (2009) , "Automated trade off between time and cost in planning repetitive construction projects" Construction Management and Economics, Volume 27, Issue 8, 2009.
[11]Mahanim Hanid, Lauri Koskela, Mohan Siriwardena, )2010,2013) , "Construction cost management: An analytical taxonomy for critical literature review". Available at: http://www.academia.edu/404390/Construction Cost Management an analytical taxonomy for critical literature review 2010, Accessed Jan 06, 2013.
[12]Missbauer and Hauber.(2006), "Bid calculation for construction projects: Regulations and incentive effects of unit price contracts". European Journal of Operational Research, Volume 171, Issue 3, 16 June 2006, Pages 1005 - 1019.
Volume 3, Issue 1 - Serial Number 6
Serial No. 6, Spring Quarterly
Spring 2023
Pages 94-112

  • Receive Date 09 April 2022
  • Revise Date 07 January 2023
  • Accept Date 21 May 2023
  • First Publish Date 22 May 2023
  • Publish Date 22 May 2023