A.Osuli, E.Negabat, A.Bayani, A.Naseri, H.Afkhami, Project Management Body of Knowledge, Printing, Tehran, National Petrochemical Company, 1384. (in Persian )
Al salman, A.A, Assessment of risk management perceptions and practices of construction contractors, Saudi Arabia, MSc. Thesis of Construction Engineering and Management, Department of Civil Engineering, King Fahd University of Petroleum & minerals, 2004.
Arikan, A.E, Development of a risk management decision support system for international construction projects, MSc. Thesis of civil engineering, Department of civil engineering, Middle East technical university, 2005.
Baccarini D, Archer R, The risk ranking of projects: a methodology, International Journal of Project Management, vol.19, 139-145,2010.
Cooper, D.I, and Chapman, C. B, Risk Analysis for large projects, Wiley, Chichester,1987.
Covello V.T, Mumpower. J, Risk analysis and Risk Managemen, An historical perspective. Risk analysis, 1985.
Dias Jr, A., and P. G Ioannou, A desirability model for the development of privately-promoted, Infrastructure. UMCEE Rep, 1995.
E. Rafizadeh, Review and risk assessment projects with a fuzzy, approach MS Thesis, Department of Civil Engineering and the environment, Amirkabir University of Technology,1388.
(in Persian ). H.Ghodsipoor, Analytic Hierarchy Process, Publication Center Amir Kabir University (Tehran Polytechnic), 1379.
Isaksson T, Stille H, Model for estimation of time and cost for tunnel projects based on risk evaluation, Rock mechanic, Rock engineering, Vol. 38 NO .5, 373-398,2005.
ITA/AITES, Guidelines for tunneling risk management: International Tunneling Association,Working Group No. 2. Tunneling and underground space technology, Vol.19. 217-237,2004.
Klein J. H, Cork R. B, An approach to technical risk assessment, International Journal of Project Management, 16(6), 345-351,1998.
M. Emad, A Talebnejad, M. Gharabaghani, Geotechnical risk assessment of all sections of drilling machines (TBM) subway tunnel. Case Study: Tehran metro line project seven), 1389.
M. Momeni, A. Sharifi Salim, Multiple Attribute Decision Making model and software,1390. M.H. Gholami, J. Ariani, Prioritize strategies HSE management to help increase productivity in hierarchical analysis, The third Conference HSE, 1389.
(in Persian ).
McDermott R. E, Mikulak R. J, Beauregard M. R, The basics of FMEA, New York, Quality Resources, 1996.
Pertmaster Software, Pertmaster Project Risk V7.5: Tutorial, manual and help, Available on: http://www.pertmaster.com/,2002.
Project Management Institute, A guide to Project Risk management Body of Knowledge (PMBOK), 2008.
Schultz, RL, D .P Slevin, and J. K pinto, Strategy and tactics in process model of project implementation, Interface:34-36, 1987.
Wirba E.N, Tah J.H.M. and Howes, R, Risk interdependencies and natural language computation, Journal of Engineering Construction and Architectural Management,3(4):251-269,1996. Xu L, Liu G, The study of a method of regional environmental risk assessment, Journal of environmental assessment, 90(11). 3290- 3296,2009.