System Engineering and Productivity

System Engineering and Productivity

Modeling of Machinery Productivity Management Based on System Dynamics Approach

Document Type : Research Paper

Author
M.Sc., Faculty of Engineering, Islamic Azad University, Khomeinishahr, Isfahan, Tehran
Abstract
Machinery productivity management requires forward-looking decision-making with a comprehensive approach. In today's competitive world, machinery productivity is one of the fundamental and important components of ensuring success and profitability in construction projects. Given that the largest portion of the country's development budget is spent on construction machinery costs every year, increasing productivity in this field requires a precise and systematic conceptual framework. Machinery management is a dynamic phenomenon that changes over time and is influenced by several factors, each of which also changes over time. As a result, we form these models based on systems thinking, and the science of system dynamics is a management tool based on this approach. Therefore, in this research, we used the system dynamics tool (cause and effect diagrams) to implement and better understand the modeling of machinery productivity management. Since models that are far from the insight of experts, experts and project agents using the model will not be practical and applicable. Therefore, by examining and identifying the factors affecting the productivity of machinery by project agents (employer, contractor and consultant), the models presented in this research have been confirmed by statistical analysis, factor analysis and structural equations. In this regard, as a case study, 20 large construction projects (over one billion) of Isfahan Municipality between 2013 and 2016 were examined using 52 questionnaires distributed among project agents (employer, contractor and consultant). The research results also showed that the management method, technical performance of the machine, workshop conditions, human resources and training are among the most important factors affecting the productivity of machinery in projects.
Keywords

Copyright ©, Mehrdad Hemmasian Etefagh

 

License

This article is released under the Creative Commons Attribution (CC BY 4.0) license. Anyone is free to copy, share, translate, and adapt this article for any purpose, whether commercial or non-commercial, as long as proper citation is given to the authors and original publication.

R.Alavi., &M.Mortaheb.(1387). Investigating the Productivity of Machines in the Construction of Earthen Dams, Zanjan, Second National Conference on Dam Construction, Zanjan University, 1388. (in Persian)
P.Naderi,A.Forsatkar,M., &Khanzadi.(1387). Optimal choice of machinery fleet,strategic decision of soil operations projects, Tehran, First InternationalConference on Strategic Project Management, Sharif University. (in Persian)
Sh.Taheri .(1393).Productivity and its Analysis in Organizations (TotalProductivity Management), Tehran, Hestan Publications.M.H.Sabt., & V.Shah hoseini.(1385). Applying technology management modelsfor evaluate construction machinery, Tehran, 7th International Congress on Civil Engineering, Amirkabir University.
John D. Sterman. (2000). Business Dynamics: Systems Thinking and Modeling for a Complex World, Publisher: McGraw-Hill Education; HAR/CDR edition, ISBN-10: 9780072389159.
T. Prasertrungruang, T., hadikusumo, B.H.W.(2008). System dynamics modelling of machine downtime for small to medium highway contractors". Emerald,Engineering, Construction and Architectural management, Vol.15 No.6.
Prasertrungruang, T., hadikusumo, B.H.W.(2009a). Modeling the Dynamics of Heavy Equipment management practices and Dawntime in Large Highway contractors". Journal of construction engineering and management, ASCE.
Nepal, p.M., park, M.(2004). "Downtime model development for construction equipment management". Emerald, Engineering, Construction and Architectural management, volume 11. Number 3 Prasertrungruang,T.,hadikusumo,B.H.W.(2007).Heavy equipment management practices and problems in thai highway contractors".Emerald, Engineering, Construction and Architectural management, vol.14 No 3.
Prasertrungruang,T., hadikusumo, B.H.W.(2009b). Study of Factors influencing the efficient management and Downtime consequences of Highway Construction Equipment in Thailand". journal of construction Engineering and Management,ASCE. AS.Nahri., & M. Kardan, .(1392). Construction and Road Construction Machinery, Tehran, Publisher: simaye danesh. (in Persian)
J.Siddharth, j., & j. Pitroda,.(2015).A critical literature review on comparative Analysis of construction Equipments – Rent and Buy. Journal of International academic research for multidisciplinary, volume No.02. Issue No.12. H.Naiebi, .(1394). Survey in Social Research, Publisher:Ney. (in Persian)
H. Raminmehr,P.Charestad, .(1394). Quantitative Research Method Using Structural Equation Modeling(EQM), Tehran, Publisher: Termeh. A.Farbod,B,Oladi, & N. Abasi,.(1393).Questionnaire data analysis using Spss software, Tehran, Publisher: Abed. (in Persian)
P.Sharifi,N, Sharifi,.(1394). Research Methods in Behavioral Sciences, Tehran, Publisher: Sokhan. (in Persian)
R. Schumacker, R., Lomax, R. (2004). A Beginner's Guide to Structural Equation Modeling". 2nd Ed. Mahwah, NJ: Lawrence Erlbaum. A.Torbati,M. Arsanjani, & M. Firozshahi,.(2004). Developing a Supply Chain Management Strategy Map by Integrating Causal Loop Diagrams(CLD) and Balanced Score card (BSC),Semnan, Journal of Modeling in Engineering,
Thirteenth Year, No. 42.
Volume 2, Issue 1 - Serial Number 2
Serial No. 2, Spring Quarterly
Spring 2022
Pages 107-124

  • Receive Date 25 May 2022
  • Revise Date 07 June 2022
  • Accept Date 10 June 2022
  • First Publish Date 10 June 2022
  • Publish Date 22 June 2022