Baghlani.M&Gholai.M(2015).”Analyze soulutions related to the risks of road construction projects using fuzzy”first International Journal of civil Engineering. Nazari.A&Jaberi.M(2015).”Risk Identification in Project – Based Organizations
Using RBS Approach”International Journal of Industrial Engineering. Iranian.M & rezaian.J (2018) “ Risk Assessment in road counstruction Project Based on the PMBOk “11th international Project management Conference.
Project management institute (PMI), (2004). Project management Body of KnowledgePMBOK.
Kerzner.H. (2003). Project management, a systems approach to planning, scheduling, and controlling Thompson,P.A. & Perry, J.G. (1992),”Engineering construction Risk”, SERC of Manchester University,London,Thomas Telford, Makoie, Ahmad. & ebrahimi samani, Babak. (2009),” Assessing the Challenges of Iranian Companies in Oil and Gas Projects by DEMATEL”, Second International Project Management Conference. Bagheri, Naser. & Zarei, Azim. (2004),” Explaining the Pattern of
Manufacturing Technology Selection”, Semnan university, Iran.
Lee, 2009 "A fuzzy supplier selection model with the consideration of benefits, opportunities, costs and risks", Expert Systems with Applications, Vol., 36, Pp. 2879–2893.
Saaty, T.L ;(1980). The Analytic Hierarchy Process. McGraw-Hill, New York. Saaty, T.L ;(1996). Decision Making with Dependence and Feedback: The Analytic Network Process. RWS.