References
1- Schumacher, PE. (1995). “Quantifying and Apportioning Delay on Construction projects.” Cost Engineering.37 (2).
2- James, G., Zack, Jr. (2004). “Schedule Analysis is there agreement?” Presentation, pp. 5-6
3- Attafar, A., and Eghbali, M. (2013). “Pathology factors affecting the delay in gas transmission zone 3 project” Journal of Industrial management, School of Industrial, Tehran University.5 (2), 85-102.
4- Vatankhah. (2003). “Investigate the causes of delay in development project, case study project schoolrenovation organization of Iran.” M.Sc.thesis, J. project management and construction, Tarbiat Moddaresuniversity. (In Persain)
5- Wiliams, T. (2003). “Improvement of labor performance and productivity in Uganda’s building Industry.” PhD Thesis, Lund University, Sweden.
6- AqaeiDibaei. (2005). “Analysis of the causes of delay in the engineering sector (E), EPC petrocchemicalproject.”(In Persain)
7- Sabzeparvar, M. (2006).control project, termeh publications, Tehran, P.P 265. (In Persain)
8- Karamoozian, A.H., Shakeri, E., and Amiri, O. (2012). “Identify the reasons for the delay in projects in Iran and ways to deal with their financial approach.” Second National Conference on Engineering and Construction Management, school of civil and environmental engineering, Amirkabir University of technology. (In Persain)
9- Nejadsabzi, P. (2012). “Evaluate and Identify factors countributing to delay construction of the Marvak dam”, jahad, Lorestan. (In Persain)
10- Safavi, A., Shayanfar, M.A., Azadani, M., and Eshtehardian, E.E. (2010).” investigate the causes of the delay time on the role of urban development projects.” M.Sc., Engineering Construction Management, science and Technology University. (In Persain)
11- Biyose, R. (2009). “Identify weaknesses and problems of local companies in the oil and gas EPC projects using AHP.” Master of Management, karoon1 oil and gas operating company. (In Persain)
12- Jafari, M., Noori, S., and Gandomi, N. “Investigate the causes of delayed development projects, Case study: Sealants industry Kermanshah.” International Project Management Conference, faculty of industrial engineering, university of science and technology, Iran. (InPersain)
13- Nosraty, S., Yaghoubi, Z., and Modiry, M. (2011). “Identify causes of delay distribution of Tehran projects and prioritize them by MCDM method.” (InPersain)
14- Hajivand. (2011). “investigate the causes of delay in implementation of karkheprojects.”Tehranuniversity. (InPersain)
15- Davoodi. (1388). “identifying the causes of delay in road construction projects.” project management conference. (InPersain)
16- Doloi, H., Sawhney, A., Iyer, K.C., and Rentala, S. (2012). “Analysing factors affecting delays in Indian construction projects.” International Journal of Project Management. 30, 479–489.
17- Aziz, R.F. (2013). “Ranking of delay factors in construction projects after Egyptian revolution” Alexandria Engineering Journal.
18- Fallahnejad, M.H. (2013). “Delay causes in Iran gas pipeline projects.” International Journal of Project Management. 31, 136–146.
19- Sweis, G., Sweis, R., Abu Hammad, A., and Shboul, A. (2008). “Delays in construction projects: The case of Jordan.”International Journal of Project Management .2, 665–674.
20- Orangi, A., Palaneeswaran, E., and Wilson, J. (2001). “Exploring Delays in Victoria-Based Astralian Pipeline Projects.” the Twelfth East Asia-Pacific Conference on Structural Engineering and Construction, Procedia Engineering. 14, 874–881.
21- Assaf, S.A., and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” International Journal of Project Management. 24, 349–357.
22- Braimah, and Ndekugri, I. (2008). “Factors influencing the selection of delay analysis methodologies.”International Journal of Project Management. 26, 789–799.
23- Marzouk, M.M., andEl-Rasas, T.I. (2013). “Analyzing delay causes in Egyptian construction projects.”Journal of Advanced Research.
24- Hamzah, N., Khoiry, M.A., Arshad, I., Tawil N.M., and CheAni, A.I. (2011). “Cause of Construction Delay – Theoretical Framework.” the 2nd International Building Control Conference, Procedia Engineering .20, 490 – 495.
25- Ghosh, S., and Jintanapakanont, J. (2004). “Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach.” International Journal of Project Management.22, 633–643.
26- Hwang, B.G., Zhao, X., Ng, S.Y. (2013). “Identifying the critical factors affecting schedule performance of public housing projects” Habitat International. 38, 214-221.
27- Duy Long, N., Ogunlana, E., Quang, T., and Lam, K.Ch. (2004). “Large construction projects in developing countries: a case study from Vietnam.” International Journal of Project Management. 22,553-561.
28- Aziz, R.F. (2013). “Factors causing cost variation for constructing wastewater projects in Egypt.” Alexandria Engineering Journal .52, 51–66.
29- Manavazhi, M.R., and Adhikari, D.K. (2002). “Material and equipment procurement delays in highway projects in Nepal.” International Journal of Project Management .20, 627–632.
30-Al-Khalil, M.I., and Al-Ghay, M.A. (1999).“Delay in public utility projects in Saudi Arabia.”International Journal of Project Management. 17(2), 101-106.
31-Chan, D.W., Kumaraswamy, M.M. (1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” International Journal of Project Management. 15, 55–63.
32- Sambasivan, M., and Soon, Y.W. (2007). “Causes and effects of delays in Malaysian construction industry.” International Journal of Project Management .25, 517–526.
33- Mansfield, N.R., Ugwu, O.O., and Doran, T. (1994). “Causes of delay and cost overruns in Nigerian construction projects.”International Journal of Project Management.12, 254–260.
34- Abd El-Razek, M.E., Bassioni, H.A., and Mobarak, A.M. (2008). “Causes of delay in building construction projects in Egypt.”Journal of Construction Engineering and Management. 134, 831–841.
35- Aibinu, A.A., and Odeyinka, H.A. (2006). “Construction delays and their causative factors in Nigeria.”Journal of Construction Engineering and Management. 132, 667–677.
36- Abdul-Rahman, H., Takim, R., and Min, W.S. (2009). “Financial-related causes contributing to project delays.”Journal of Retail & Leisure Property. 8, 225–238.
37- Jergeas, G. (2009). Improving Construction Productivity on Alberta Oil and Gas Capital Projects, Alberta Finance and Enterprise, pp. 1–56.
38- Al-Kharashi, A., and Skitmore, M. (2009). “Causes of delays in Saudi Arabian public sector construction projects.”Construction Management and Economics.pp. 3–23.
39- Al-Momani, A.H. (2000). “Construction delay: a quantitative analysis.” International Journal of Project Management. 18, 51–59.
40- Dlakwa, M.M., and Culpin, M.F. (1990). “Reasons for overrun in public sector construction projects in Nigeria.” International Journal of Project Management.8, 237–241.
41- Han, S.H., Yun, S., Kim, H., Kwak, Y.H., Park, H.K., and Lee, S.H. (2009). “Analyzing schedule delay of mega project: lessons learned from Korea Train Express.” IEEE, Transactions on Engineering Management. 56, 243–256.
42- Lo, T.Y., Fung, I.W., and Tung, K.C. (2006). “Construction delays in Hong Kong civil engineering projects.”Journal of Construction Engineering and Management. 132, 636–649.
43- Odeh, A.M., and Battaineh, H.T. (2002). “Causes of construction delay: traditional contracts.”International Journal of Project Management. 20, 67–73.
44- Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.”International Journal of Project Management.21, 321-326.
45- Hosseini, S.Y. (1382). Nonparametric statistics, Tabatabai univesity publications, Tehran. (In Persain)
46- Farshchi, S.M. (2002). “Etminan Shargh Statistacal Data Processing.” <http://www.spss-iran.ir> (March, 13, 2015). (In Persain)
47- Bramble, B., and Callahan, M. T.)1992(. "Construction delay claims", 2nd Ed., Wiley, New York